Chennai Corporation bracing for monsoon

After the 2015 floods, the Greater Chennai Corporation has been constantly reviewing its monsoon-preparedness. This year too, the civic body is ensuring that precautionary steps are in place, well ahead of the north-east monsoon.

By :  migrator
Update: 2017-09-10 19:04 GMT
Ripon Building

Chennai

At a recent meeting at the Ripon Building, the civic body reviewed various measures. The localities which faced a severe water logging during the rains last year will be a priority for the civic body. It is also identifying other water-logged areas and will ensure that pumpsets are made available to tackle the issue, stated a release.

The Corporation is also focussing on stormwater drains, which will be connected to the nearby waterbody. The 219 tanks under its control would be ready for storing rainwater. Before the onset of monsoons, the repairing of streetlights would be completed, while major road works have been suspended.

In case of flooding, the Corporation has identified places to set up evacuation camps for those residing in low-lying areas. The civic body will also act on complaints received, while also mandating officials of other departments such as Tamil Nadu Electricity Board (TNEB) and Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) to be present in the control room during this period.

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

Similar News