These areas of Chennai will face power shutdown on July 15; check details here

Supply will be resumed before 2 pm if the works are completed.

Update: 2024-07-13 09:33 GMT

Representative Image 

CHENNAI: Power supply will be suspended in Pallavaram, Porur, Besant Nagar and Avadi areas on Monday from 9 am to 2 pm for maintenance work.

Supply will be resumed before 2 pm if the works are completed.

Pallavaram: Periyar nagar, Balagurusamy Street, Jayaraman street, Palaniyappa Street, Balasubramanian street, Songuvel street, Magimaidoss street, Baskar street, Arulpandian street, Rajivgandhi nagar, Dili street, Periyar nagar, Srinivasa colony, MGR Salai, P.P.Ammal Koil.

Besant Nagar: Lakshmipuram, Sasthiri nagar, Kamarajar salai, Valmiki street, Part of Kalasethra road, Lakshmipuram, Sri Ram nagar, Kumaraguru 1 to 4th street, Part of Pillaiyar koil street.

Porur: Kovoor, Kozhumanivakkam, Melma nagar, Thandalam, Irandaam kattalai, Sadhanandhapuram, Karaima nagar, Manikanda nagar, Metro Hightech & Star City.

Avadi: Thirumullaivoyal, Kulakarai, Thiruvalluvar street, Subramaniyar nagar, Thirumalai nagar, Kulakarai street, Masilamani Eswar Nagar, Ettiyamman Nagar, North Mada Street, South Mada Street, Palli Vinayakar koil street, Kovilpathagai, Poompozhil nagar, Tirumalaivasan nagar, Ashok nagar, Poompozhil nagar, Bible college, St.Peter’s Nagar, Crist Colony, Kannadapalayam, Ramakrishna nagar, Senthil nagar, Srinagar Colony, Raventhra nagar, Sridevi Vaishnavi nagar, Srinagar colony, Mullai Kurunji street, Cholan nagar, Thendral nagar, Jak nagar, Mullai nagar, Thendral nagar east & west, Padmavathy nagar, Ambedkar nagar, Thirumullai voyal colony, Moorthy nagar.

Tags:    

Similar News