New normal at MMRT circuit with safety protocols

With the easing of lockdown restrictions, the Madras Motor Sports Club is gearing itself up for the “new normal” with a slew of measures conforming to government regulations to create a safe environment at the iconic MMRT circuit here while also carrying out upgrades to the track.

By :  migrator
Update: 2020-06-10 18:59 GMT
A model of the Grandstand that is being built at MMRT circuit

Chennai

Keeping in mind the situation arising out of Covid-19 virus, the MMSC will implement safety protocols as mandated by the government at the MMRT. Simultaneously, a new grandstand, digital flags that can be operated from the Race Control room and self-contained Marshal posts are being added to the facility.

MMSC president Ajit Thomas said: “This is a difficult and sensitive phase we are going through and it is MMSC’s endeavour to ensure that track users, be it vehicle manufacturers who test their products here or the competitors, are provided a safe and healthy environment.

“In this context, we have already put in place the ‘new normal’ protocols such as thermal temperature check at the entrance, social distancing and hand sanitisation, as per government regulations.”

The track has been active for the past few days with testing sessions by vehicle manufacturers, and the facility will be opened to car and bike competitors from June 14 for paid practice sessions.

Regarding various upgrades to the track, MMSC vice-president Vicky Chandhok, who is also Chairman of Racing Events, said: “The track is open for non-sporting activity as we try to ease into a situation and conditions we are not familiar with. So, we are not taking anything for granted or lightly. Health and safety of our employees, officials, competitors and visitors are our priority.”

MMSC is also addressing a long-felt need for a permanent grandstand along the start-finish straight, facing the eastern paddock and pits. “For the moment, it would be a 600-seater structure with a provision for expansion. The bottom rung of the stand will start three metres above track surface. Below the stands, we are providing space for two-wheeler academies with access to the track, food kiosks and self-contained toilets. This facility should be ready by September,” Chandhok added.

Visit news.dtnext.in to explore our interactive epaper!

Download the DT Next app for more exciting features!

Click here for iOS

Click here for Android

Tags:    

Similar News