Showing results for "#Metro Water Board"
Pipeline from Veeranam Lake repaired, water supply restored
A leakage occurred in the Veeranam transmission pipeline near the Puthupakkam area on the Vandalur-Kelambakkam Highway, halting the water supply from...
Change, rectify your name for free in Chennai Metro Water records
2 Oct 2024Consumers can submit their name change or correction forms at the collection centres in their respective area offices for rectification.
Chennai Corporation to restore Madhavaram’s interior roads ahead of...
15 Sept 2024The Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) had dug up several interior roads in the Madhavaram zone to lay pipelines for...
Stop construction of pumping station in Iyyappanthangal: Residents to...
22 Aug 2024V Parameswaran, secretary, Padmavathi Nagar Residents Welfare Association, said: “The construction work began five months ago. We assumed that the...
Illegal ramp for parking built on narrow lane in Royapuram
7 July 2024Already, Somuchetty Main Road was closed for Metro Water board’s underground maintenance work. So, commuters have to take Somuchetty Third Street that...
Shoddy work by GCC, Metro Water board results in sewage stagnation at...
6 July 2024Residents tried to reach out to the officials of both the Metro Water board and GCC but no respite. People complain that the ward member failed to...
Chennai Metro Water sets up circular pipeline that connects all water...
8 Jun 2024The project is set to ensure equal, uninterrupted distribution across city by interlinking desalination plants and reservoirs, announcement soon in...
Retteri Lake storage capacity to increase from 33 mcft to 45 mcft
4 May 2024The department has issued notice to 55 houses that have encroached on the lake bund. The eviction drive will be carried out at the earliest.